ENVIRONMENTAL STUDIES

CONSTRUCTION UPDATES

Click the hyperlinks below for more information about each construction activity.

To stay up to date on the latest project updates, join the Northwest Utah County Projects group by clicking the icon below.

UTAH COUNTY PROJECT OVERVIEW

2100 NORTH TO PORTER ROCKWELL BOULEVARD

 

Construction has started on Mountain View Corridor in Utah County. This project will construct 4 new miles of freeway between Utah and Salt Lake Counties, connecting 2100 North in Lehi to Porter Rockwell Boulevard in Herriman. Improvements include: 

  • Constructing four miles of new roadway 

  • Creating a four-leg intersection at Porter Rockwell Boulevard 

  • Upgrading the intersection at 2100 North and Redwood Road to an interchange 

  • Installing wildlife fencing 

  • Constructing a multi-use trail 

Construction is expected to last through spring 2026. This will be the first freeway segment of MVC constructed in Utah County.  

WHAT TO EXPECT THROUGHOUT THE PROJECT:

  • Day work Monday - Friday, 7 a.m. - 6 p.m. (weekend and nightwork as needed) 

  • Trucks entering and exiting the work zone 

  • Increased noise, dust and vibrations 

  • Traffic shifts, lane closures, detours as needed 

UTAH COUNTY NEARBY PROJECTS

ACTIVE PROJECTS

20561 | Pioneer Crossing:

Redwood Road to I-15

This project will provide two additional travel lanes in the peak direction of travel depending on the time of day (similar to 5400 South in Salt Lake County).  This will include installing an additional travel lane in each direction between Mill Pond Road and I-15, providing a total of four travel lanes in each direction for that section. It will also extend the outside travel lane in each direction between Redwood Road and Mountain View Corridor, providing a total of three travel lanes in each direction for that section. Intersection and turn pocket modifications will also be constructed. Construction is expected to begin as early as late summer 2025. 

For more information, visit udotinput.utah.gov/pioneer crossing

13420 | 2100 North:

Mountain View Corridor to I-15

Following completion of the current MVC project (2100 N to Porter Rockwell Blvd), the 2100 North Freeway project will begin construction. This project will construct freeway lanes between the existing eastbound and westbound roadways, which will become frontage roads. For more information, visit udotinput.utah.gov/2100north

PLANNED PROJECTS

13610 | Cory Wride Freeway:

Ranches Parkway to Mountain Corridor

The first phase of the Cory Wride Highway (SR-73) freeway frontage road project from Ranches Parkway in Eagle Mountain to Mountain View Corridor in Saratoga Springs will ease congestion and accommodate future transit, bike lane and trail improvements. The preliminary layout minimizes impacts to existing properties and preserves access to existing developments. Construction is expected to start as early as 2027. 

For more information, visit udotinput.utah.gov/plannedprojects

17450 | Mountain View Corridor:

Cory Wride Highway (SR-73) to 2100 North

UDOT will construct new MVC freeway lanes and interchanges between 2100 North in Lehi and Cory Wride Highway (SR-72) in Saratoga Springs. The new freeway lanes will be built between the existing roadways, which will become frontage roads. This project will include improvements and additions to the nearby trail system. Construction is expected to start as early as summer 2029. 

 

For more information, visit udotinput.utah.gov/plannedprojects

18341 | Mountain View Corridor South:

Pioneer Crossing to Redwood Road

UDOT is preparing a State Environmental Study (SES) to evaluate a possible 10-mile extension of MVC to Redwood Road near Pelican Point. The study is expected to be complete by late summer 2025.  

For more information, visit udotinput.utah.gov/mvcsouth